SBCC
Hoover Dam Banner

Septic Tank FinishedSBCC worked as a design consultant to CJM Construction to provide civil engineering, including geotechnical and survey services (through subcontract) for the design of a "Wisconsin Mound" type septic disposal system for a proposed Hoover Dam security checkpoint facility to be constructed and managed by the Bureau of Reclamation (BOR). The provided work scope included the following items:


Hoover Dam Septic System 3D Video

Septic 3D_2 HooverDam